Well, the good-ish news is that I've finished covering the walls with plasterboard; Hannah and Joe will be glad to hear the end of my late night drilling.
Next, comes the task of redoing the ceiling (we have more than enough plasterboards) so it matches up/is level (the first two were put on the wrong way around and don't join on a joist). Then there will be floor levelling - which might turn into a bigger task than I wanted as half the floor is tiled (raised by approx 5mm higher) :-(.
Mummy, can Santa do my DIY for me?
Comments
Post new comment